									S5106 On Time performance:
																		
							
										
																					72																				
									
																			We have calculated the percentage of flights that arrived within 15 minutes of their scheduled time, or earlier, based on real flight data from the last 3 months. More about punctuality and delays																	Flight Status
S5106 Star Air from Belgaum
																	
										Scheduled
																																								Flight Status for  Tuesday November 04, 2025
									
									
									
								
							
Scheduled
																																								Flight Status for  Tuesday November 04, 2025
									Departure
										Belgaum (IXG)
									
									
																				November 04, 2025									
								Belgaum Airport
									
									
														Scheduled Departure Time:													
													
														18:40													
												
													Terminal:												
												
													 - 												
											
													Gate:												
												
													 - 												
											
											Scheduled Departure Time:  18:40										
										
							Arrival
										Bengaluru (BLR)
									
									
																				November 04, 2025									
								Bengaluru Kempegowda International Airport
																
									
												Scheduled Arrival Time:											
											
												19:45											
										
												Terminal:											
											
												 2											
										
												Gate:											
											
												 - 											
										
											Scheduled Arrival Time:  19:45										
																			
								
							Disclaimer
							
															The information displayed on this website is gathered from third-party providers with a wide reputation on the sector, which in turn obtain the information from the airlines. This data is provided only for informative purposes. www.bangaloreairport.com assumes no responsibility for loss or damage as a result of relying on information posted here. Please contact your airline to verify flight status.
														
						Additional Information
								Which is the frequency of flight S5106? 
The flight S5106 is currently not scheduled at Bangalore Kempegowda Airport (BLR).
Which is the distance of flight S5106?
The distance between the two airports is 445 kilometers.
Which is the flight time of flight S5106?
The scheduled flight time gate to gate is: 01:05 hours.
The real flight time gate to gate on average is: 01:06 hours.
							
Are the departure airport and arrival airport at the same Time Zone?
Yes, both airports are in the same timezone.
						The flight S5106 is currently not scheduled at Bangalore Kempegowda Airport (BLR).
Which is the distance of flight S5106?
The distance between the two airports is 445 kilometers.
Which is the flight time of flight S5106?
The scheduled flight time gate to gate is: 01:05 hours.
The real flight time gate to gate on average is: 01:06 hours.
Are the departure airport and arrival airport at the same Time Zone?
Yes, both airports are in the same timezone.
Alternative Flights
																						The following airline serve the same route between Belgaum and Bengaluru:
IndiGo - Flight Number: 6E7239. (On Time performance: 87 - Average Delay: 5 minutes)
							
							
						IndiGo - Flight Number: 6E7239. (On Time performance: 87 - Average Delay: 5 minutes)
Punctuality and delays
									
								We have gathered data from recent months and present below an analysis of how timely the flights have been.
								
									
										
											
										
									
										
																									Delays analyzed by Weekday: We have gathered available data from last six months, spanning from May 01, 2025 to October 28, 2025. Next, you can observe the results broken down by day of the week: number of flights analyzed, on-time performance per day, and average delay per day.
									
										
											
												
											
										
										
											
												
											
										
												
																			Note: We have excluded some days from the graph, since the quantity and quality of the data is not representative enough.
Delays analyzed by Month: We have gathered available data from last twelve closed months, spanning from May 01, 2025 to September 30, 2025. Next, you can observe the results broken down by month: number of flights analyzed, on-time performance per month, and average delay per month.
									
										
											
												
											
										
										
											
												
											
										
										
												
																			Note: We have excluded some months from the graph, since the quantity and quality of the data is not representative enough.
																								
                            
                        
										In terms of On-Time Performance, by analyzing the flight data from the last three months, spanning from July 30, 2025 to October 28, 2025, we have obtained these figures.
Total number of flights: 39
On Time: 28 ( 72 % )
Moderate Delay: 0 ( 0 % )
Significant Delay: 0 ( 0 % )
Major Delay: 11 ( 28 % )
Canceled: 0 ( 0 % )
Diverted: 0 ( 0 % )
										
Average Delay: 87 minutes.
									Total number of flights: 39
On Time: 28 ( 72 % )
Moderate Delay: 0 ( 0 % )
Significant Delay: 0 ( 0 % )
Major Delay: 11 ( 28 % )
Canceled: 0 ( 0 % )
Diverted: 0 ( 0 % )
Average Delay: 87 minutes.
Delays analyzed by Month: We have gathered available data from last twelve closed months, spanning from May 01, 2025 to September 30, 2025. Next, you can observe the results broken down by month: number of flights analyzed, on-time performance per month, and average delay per month.
Last Past Flights S5106
Date
								Departure
								Arrival
								Duration
								Aircraft
								Status
							Tuesday
28 October
									28 October
18:40
Belgaum (IXG)
									Belgaum (IXG)
19:45
Bengaluru (BLR)
									Bengaluru (BLR)
01h 05min
									Embraer 175
									Embraer 175
									 - On-time
								Tuesday
21 October
									21 October
18:40
Belgaum (IXG)
									Belgaum (IXG)
19:45
Bengaluru (BLR)
									Bengaluru (BLR)
01h 05min
									Embraer 175
									Embraer 175
									 - On-time
								Tuesday
14 October
									14 October
18:40
Belgaum (IXG)
									Belgaum (IXG)
19:45
Bengaluru (BLR)
									Bengaluru (BLR)
01h 05min
									Embraer 175
									Embraer 175
									 - On-time
								Tuesday
07 October
									07 October
18:43
Belgaum (IXG)
									Belgaum (IXG)
19:47
Bengaluru (BLR)
									Bengaluru (BLR)
01h 04min
									Embraer 175
									Embraer 175
									Landed - On-time
								